Saturday, April 10, 2010

Kitchen remodel day off

We are taking the day off from remodeling today.
The refrigerator was delivered today! Yea! I love it, it has water in the door. I have never had a fridge this fancy before. Until now I never wanted one. Too many things to break on fancy stuff. But with a husband as handy as mine I am not going to worry about it.
I have been wanting one of these french door fridges for a while, then my mom got one and I was green with envy.
And now TA DA!


Saturday, April 3, 2010

Palm Tree Afghan

I know you thought I hadn't done anything crafty in a long time, but this actually took me a long time to make.

 I fell in love with this pattern when I saw it online. Amazingly enough it really looks like the pattern picture! See for yourself @ freepatterns.com, you have to register but it's free.
My next crochet piece is a cute little vest. You may or may not see it, depends on how it looks. I'm not very good at crocheting clothes.
Wish me luck!



Kitchen remodel days 18 & 19

This light was actually installed the day the granite was installed but I forgot to post it.


The island light we installed on Day 18. This is not a very good picture. I will try to get a better one later.

Day 19


Today Edwin installed the rest of the flooring, I had started it last week. I couldn't help much but to tell him he was cutting it wrong. That's my job these days, I hurt my shoulder so I have to take it easy for a while. Tough for me to do, I like to be in the thick of it.

It is so nice to walk on my finished floor instead of cement board.
This tile is really easy to put down, we got it at Home Depot. It's 36" x 5" wide planks. Really looks like wood.